sand & cement, close-upSand and cement screed
The traditional mix, laid by hand and compacted to a firm base. It suits most domestic rooms and extensions.
UK-wide screeding
We lay sand and cement, liquid, fast drying, self levelling and underfloor heating screed. Tell us about your floor and we will send a written quote with a drying timetable for the screed you need.
Close-up of a finished screed
Fill in the short form below and we will reply with a price and a drying timetable for your floor.
Each screed type has its own depth, drying time and best use, so choose it by the job and not by habit.
sand & cement, close-upThe traditional mix, laid by hand and compacted to a firm base. It suits most domestic rooms and extensions.
liquid, close-upPumped into the room and self flowing, so it works well across large areas and over heating pipes.
fast drying, close-upShortens the wait before tiling or laying flooring, which helps when the programme is tight.
self levelling, close-upA thin layer that settles flat, used to correct an uneven floor before the final covering goes down.
over UFH pipes, close-upCovers the pipes and spreads the heat evenly, and the depth over the pipes affects how quickly the room warms.
Most screeding contractors hide the numbers that homeowners and main contractors need, so we publish them on the page.
Walk-on and tiling times for each screed type, listed in hours and days.
Sand and cement compared with liquid screed, side by side.
How deep the screed should be laid, and the cover required over underfloor heating pipes.
We test the moisture content before any finish goes down, because a damp screed can ruin a new floor.
| Screed type | Walk on | Tile or finish |
|---|---|---|
| Sand and cement | 24 to 48 hours | About 1 day per mm up to 50 mm, then 2 days per mm |
| Liquid | 24 to 48 hours | Often 1 day per mm up to 40 mm, then 2 days per mm |
| Fast drying | About 12 hours | 1 to 4 days, depending on the finish |
Drying depends on the screed type, the depth and the conditions in the building, so see the timetable above. As a rule of thumb, sand and cement needs about a day per mm for the first 50 mm, then two days per mm. Always check the product data sheet.
The cover over the pipes is set by the screed type and the heating system. As a guide, underfloor heating pipes need at least 25 mm of screed over them. Overall depth is typically 65 mm for sand and cement and 50 mm for liquid.
Only once a moisture test passes, so we run that test before any tiling starts.
We work across the United Kingdom for residential and commercial construction projects.
Send your details on the form and we will reply with a written quote and a drying timetable.